Skip to main content
Back to Services

DevOps and Cloud Architecture for Life Sciences

Improve how life sciences software is deployed, migrated, and operated. DataDrill brings DevOps and cloud architecture into the same delivery plan as your applications, data pipelines, and internal team.

DevOps and Cloud Infrastructure Services

Cloud migration and consolidation

Map applications, databases, jobs, permissions, and dependencies before selecting migration waves. Define reconciliation, cutover, and rollback criteria around the business workflow, not just whether a server starts.

    Infrastructure as code

    Keep infrastructure definitions versioned and reviewable. Make environment differences explicit so the team can understand what changed, reproduce the configuration, and recover without relying on one person.

      CI/CD and controlled releases

      Automate build, test, and deployment steps with the approval and environment boundaries the workload needs. A faster pipeline is useful only when failures, ownership, and rollback are understood.

        Containerization and platform operations

        Adapt suitable workloads for container-based operation and document the responsibilities around configuration, credentials, runtime behavior, and release management. Containerization is a design choice, not a requirement for every service.

          Separated environments and handover

          Keep development, staging, and production responsibilities clear. Provide configuration, operating procedures, and handover documentation so the team can maintain the environment after delivery.

            Featured Case Study

            AWS-to-Azure Migration for a Global CRO

            In an AWS-to-Azure migration for a global CRO, DataDrill migrated 2.5TB of data, moved seven PostgreSQL databases, and containerized more than 100 Lambda functions onto Azure Kubernetes Service. The engagement recorded zero major downtime and 70% faster deployments. The 2.5TB figure describes the total migrated data, not a daily clinical-data volume.

            In a separate post-acquisition engagement, DataDrill consolidated AWS, OVH, and DigitalOcean infrastructure into Azure, rebuilt delivery pipelines, and separated development, staging, and production. The migration completed with zero data loss and no user-facing disruption. Deployment cycles moved from days to under an hour.

            Read the documented case studies

            How We Scope and Deliver the Work

            Start with a workload inventory and the operational constraints that matter to its users. Identify dependencies and migration groups. Build and test the target environment, rehearse a representative migration, and record the recovery path. Move workloads in agreed waves, reconcile the result, and hand over the operating procedures.

            The engagement can use a project team, embedded engineers, or an augmented squad. Access requirements, dependencies, acceptance criteria, decision ownership, and handover are agreed with your team.

            Architecture and Delivery Tradeoffs

            Not every application benefits from a move to containers, a new cloud, or a complete platform rebuild. Existing licenses, managed-service dependencies, data transfer, team capability, and support responsibilities can change the preferred approach.

            Our documented results describe particular migrations. They are not blanket promises of zero downtime, a fixed cost reduction, an uptime SLA, or a compliance certification. Reliability targets and support responsibilities are agreed for the actual engagement.

            Our Process

            What We Agree Before Calling the Work Complete

            01

            Capture the workload dependencies

            Record databases, queues, scheduled jobs, service accounts, network routes, storage, and third-party connections. A migration plan is incomplete when it moves an application but misses the job that prepares its data or the identity that gives it access.

            02

            Rehearse representative migration

            Test the movement and reconciliation of a representative workload before cutover. Confirm who decides whether the test passed, the allowed interruption, and the recovery point. Keep the rehearsal findings connected to the actual migration checklist.

            03

            Test releases and rollback

            Demonstrate a successful release and a failed one in the appropriate non-production environment. Confirm how configuration and secrets are supplied, where errors are observed, and how the previous working state can be restored.

            04

            Handover the operating model

            Document deployment responsibility, alert ownership, access management, and recovery procedures. Infrastructure as code is a useful artifact, but it does not replace a team that understands when and how to operate it.

            Team Competences in Life Sciences DevOps and Cloud

            Our DevOps teams bring certified expertise across the full spectrum of cloud and infrastructure technologies.

            AWS Solutions Architects & DevOps Engineers
            GCP & Azure Cloud Specialists
            Kubernetes & Docker Experts
            Terraform & Pulumi IaC Engineers
            Site Reliability Engineers (SRE)
            Security & Compliance Specialists
            CI/CD Pipeline Architects
            Database Administration & Optimization

            Technology Stack for Life Sciences DevOps and Cloud

            We work with industry-leading tools and platforms, always selecting the right technology for your specific requirements.

            Cloud Platforms

            • AWS
            • Google Cloud Platform
            • Microsoft Azure
            • DigitalOcean

            Orchestration & Containers

            • Kubernetes
            • Docker
            • Helm
            • ECS/Fargate
            • Nomad

            Infrastructure as Code

            • Terraform
            • Pulumi
            • CloudFormation
            • Ansible
            • Chef

            Monitoring & Observability

            • Prometheus
            • Grafana
            • Datadog
            • ELK Stack
            • PagerDuty

            Additional Life Sciences DevOps and Cloud Capabilities

            Multi-cloud and hybrid cloud architecture
            Zero-downtime deployment strategies (blue-green, canary)
            Disaster recovery and business continuity planning
            FinOps and cloud cost management
            SOC 2, HIPAA, and GxP compliance automation
            Secret management with HashiCorp Vault
            Service mesh implementation (Istio, Linkerd)
            GitOps workflows with ArgoCD and Flux

            Frequently Asked Questions About Cloud Migration and DevOps

            Can you consolidate several clouds into one environment?

            Yes. A documented engagement consolidated AWS, OVH, and DigitalOcean into Azure. The appropriate target for a new project depends on its workloads and constraints.

            Do you guarantee zero downtime for every migration?

            No. Published outcomes describe specific engagements. Downtime tolerance, rehearsal, cutover, and recovery criteria must be scoped for each migration.

            Does every service need to be containerized?

            No. Containerization should be selected when it fits the workload and operating model. Some applications are better served by other deployment patterns.

            Can you work with our existing CI/CD tooling?

            The delivery approach is scoped around the current repository, release process, environments, and team responsibilities rather than replacing tools by default.

            How do you prevent environment drift?

            Versioned infrastructure, reviewed changes, explicit configuration, and environment-specific tests can make drift visible and reduce manual divergence.

            Who operates the environment after the project?

            Operational ownership, documentation, support responsibilities, and handover are agreed with your team as part of the engagement.

            Plan Your Next Step

            Tell us the workflow you need to improve, the systems involved, and the responsibility you want the engagement to cover. Contact DataDrill to discuss a scoped starting point.

            We use Google Analytics cookies to understand how the site is used. They are only set if you accept. Privacy Policy